Camber calculation dialog
Used to define if and when the camber shall be calculated, as well as the prefixes for the camber calculations.
By entering a label the action DoCamber can be added to the schedule of the Analyzer, in fact optionally at the begin and the end of the stage, after the calculation of the load case "Pre-stressing", after the load case "Traveler" and after the load case "Wet concrete". For more detailed information for the command DoCamber see online-help of RM Bridge.
Setting | Description |
---|---|
Camber at begin | If checked, the camber for the begin of the stage will be stored |
Camber at the end | If checked, the camber for the end of the stage will be stored. |
Prestressing | Label for the command DoCamber after prestressing (e.g., PT). |
Traveler | Label for the command DoCamber after traveler calculation (e.g. TR). |
Wet concrete | Label for the command DoCamber after wet concrete calculation (e.g. WC). |