Two new runs are added to a main branch. They are located at
different elevations and are offset from the center line of the main branch. A
tee fitting is in place.
Select
(Device
Hookup) to route from the first new run to one of the tee's branches.
Select the tee, then the duct.
The new route is seen in dynamics, and
precisely placed using
AccuDraw distance
locks.
Repeat step two for the second new run.
Review the new routes that connect the two new runs. Some
manipulations may be needed to clean up the routes.