Drainage and Utilities CONNECT Edition Help

Civil

Setting

Description

Component Quantities - Report includes component (concrete, topsoil, shoulders, cut and fill volumes) surface area, volumes, units of measure, unit cost, and component and total cost.

Design Input Report - Opens the Civil Report Browser with the default Roadway Setup Report, which includes corridor station range, key stations, template drop information, constraints, point controls, transitions, end condition exceptions, and superelevation section information.

Results Report - Opens the Civil Report Browser with the default Roadway Setup Report which includes more detailed information on corridor station range, key stations, template drop information, constraints, point controls, transitions, end condition exceptions, and superelevation section information.

Milling Report - Opens the Civil Report Browser with a report on milling / stripping components.

Superelevation Report - Superelevation reports can be generated for a single or multiple sections. The reports are displayed in the Civil Report browser.