STAAD.Pro Physical Modeler Help

To copy loads from a load group

To copy the load items from another load group to the current load group, use the following procedure.

  1. On the Model ribbon tab, select the Copy Loads From Group in the Loads group.

    The Copy Load Group dialog opens.
  2. Select the name of the source load group to copy loads from.
  3. Click OK. All load items from the source load group are copied to the current load group (selected in the status bar).