T.2 Short-listing the load cases to be used in concrete design
The concrete design should only be performed for load cases 4 and 5 since those are the factored cases. Use the load list to instruct the program to use just these cases.
The concrete design should only be performed for load cases 4 and 5 since those are the factored cases. Use the load list to instruct the program to use just these cases.