STAAD Foundation Advanced Help

Drilled Pier Job page

Used to input general job data.

SettingDescription
Job Name

Should be unique for each job. By default Job Name is set as Drilled Pier Job.

Design Method

There are three methods for analyzing/designing drilled pier:

  • API Method (based on API RP 2A-WSD)
  • FHWA 1999 Method (based on FHWA-IF-99-025)
  • Vesic method (based on Design of Pile Foundations, by A.S. Vesic, 1977, National Transportation Research Board, National Research Council)
Next >

Proceeds the Wizard to the next step.

Cancel

Exits the Wizard without creating a new Drilled Pier Job.