Creating a detail plan and elevation drawing for a foundation
- Create a foundation job.
- Perform the design.
- Select the Detail and Schedule Drawing tab in the Main View window.
- Select the option for Detail Drawing.
- Select the footing you want to display (if multiple footings are included in this job).
- (Optional) Click Save Drawing Notes
- Click Save Drawing As…. The Save As dialog box (drawings) opens.
- Specify a name for the drawing and select the location where it will be saved.
- Click Save.