Create an Isolated Footing Job
Now that all the global project data has been inputted, you have the ability to design the foundation using Isolated Supports, Pile Caps, Strip Footing or you could support the entire structure on a single Mat Foundation. You will not have to create separate input files for entering all this information. All you have to do is to create separate jobs under the same project.
- Click on in the Main Navigator pane.
- Enter the following values in the Job Info form (top half of the Data area):
- Click the Select All () button to move all the load cases over to the Selected Load Cases list on the bottom of the page.
- Click Create Job. A new leaf is added to the Main Navigation pane for the Isolated Footing job.