Creating a combined footing job
-
Create two or more linear supports and add support loads.
- Select Job Setup > Create a New Job in the Main Navigation pane.
-
In the Job Info form:
- Give a suitable Job Name.
- Select Job Type as Combined.
- Select a Design Code and Default Unit Type.
- Select which supports will be included in the Combined Footing job.
- Select loads to for the Selected Load Case list.
- Click Create Job. Some additional controls are added to the Job Info form for creating strip footings between support nodes.