Action > Store
With this action a stage calculation can be saved at a certain moment with a defined table-name. This table can be used for a later stage calculation, which can be started from this point (with the action Restart), or be used for the output of a camber calculation (DoCamber) at a certain moment.
Setting | Description |
---|---|
Action | Code of the selected Action. It is possible to switch to another action without leaving and re-entering the input function. |
Action will be skipped (Option) | The action will be skipped in the calculation process if the option is selected. |
Name of the check point, which shall be saved, or where the restart calculation should begin (till satisfaction of constraints). | |
Input of the target directory in which the calculation state shall be saved. | |
Delta-T | Duration of the Action (not applicable for this action) |
Description | Descriptive text for the selected Action (max. 80 characters) |