JavaScript must be enabled in order to use this site.Please enable JavaScript in your browser and refresh the page. Variant: Copy An existing variant of construction schedule can be copied. All the loads, additional constraints and stages of the origin variant will be copied. SettingDescription Origin CS name Name of the variant, to be copied Copy CS name Name of the new variant (max.16 char.) Description An optional description of the variant (max 80 char.) Parent topic: Construction schedule: Variants