ILM Schedule > Renumber Loadcases
Input pad for generation of multiple loading case (one per launching step) out of given Reference Load Case.
For proper consideration of creep effects within Incremental Launching Analysis it is necessary to store all intermediate launching steps as individual load case results. To keep the preparation simple it is possible to prepare only one Reference Load Case per launching sequence and generate all the necessary loading cases for the individual launching steps out of this Reference Load Case. Below input has to be specified.
The launching step series of the launching sequence, related to the same reference load case, is defined by:
Setting | Description |
---|---|
From launch | First launching step of the launching sequence with same reference load case |
To launch | Last launching step of the launching sequence with same reference load case |
Launch step | Increment of launching step numbering of above input |
The generation of the individual load case for each launching step is prepared by:
Setting | Description |
---|---|
Reference load case | Name of the Reference Load Case which is prepared for calculation and result storage of the launching steps within this launching sequence.
Tip: For easy selection press the arrow beside, which will open the Load case list containing all user defined load cases of current project.
|
Prefix | Prefix of generated new load cases for the individual launching steps Default: Name of the Reference Load Case, extend by '-' (e.g. 'ILM-1-') |
Starting number | Number of generated 1st new load case of input launching sequence, above
E.g. Launching steps are 22 to 41, prefix is 'ILM-2-', will generate new load case for these launching steps with names 'ILM-2-1' up to 'ILM-2-20' |
After confirming this input with OK the new load case names are shown in column LCase of launching table.