Topic Selection
|
From the top left table, one of different topics may be selected. Depending on the topic selection, available tables for the report and plot files from construction schedule actions are listed in the two tables below. Results For the topic 'Results', report tables are created from RM-Sets shown in the left list. As results, plotfiles from the directory of the selected construction schedule are listed. |
Add TDF-Elements to the Report
|
Simple items, such as headers, text, paragraphs or page-breaks are shown in the upper right list. By double clicking an item it will be added at the cursor position in the list of TDF-Items below. Required input data for individual items is prompted for. |
Adding Tables to the Report
|
TDF-Tables are used for the documentation of the current project definitions and for output of calculation results (topic 'result'). By double clicking one of the tables provided it is added to the list of report-items at the window bottom below the cursor position. Required input data for individual tables is prompted for. A caption may be added to tables and respective data changed later.
|
Adding Plots to the Report
|
- by double clicking a plot-file
- by marking plots and using one of the buttons to the right if 2 or 3 plots are marked - by pressing the space key -, corresponding buttons are available to add 2 or 3 plots side by side horizontally or vertically.
A caption my be added to Plotfiles and their orientation may be changed. Moreover, the input of other filenames is possible later.
|
Selection of the Construction Schedule Variant
|
for the List of Plot-Files provided. |
Modifying Report-Items
|
- Changing the order or deleting items with the arrow buttons and the delete button to the right
- Editing Data by double clicking an individual Item
- Rotate Plots
- Add captions to Tables and Plots
|
Commands
|
Create a TDF-Report A TDF-Report is created from the listed report items. Internally, for this purpose a TCL-file is created firstly (the name is equal to the report name with a leading 'temp_'). This Tcl-File may be used to manually create a report with the RM-command 'Assemble TDF-Report' in the 'File' Menu of RM. This second step is done automatically and leads to the desired TDF-Report file. The TDF-Report may be viewed by using the TDF-Viewer. In case, an instance of the TDF-Viewer-Application is active with a prior version of the report file, the viewed report is updated automatically by the viewer and changes may be observed immediately.
Load To open an existing data file.
Save and Save as... Saves the data (List of Report-Items) for later use with the construction schedule action command DoTDF or to be loaded and edited later on.
|