Reports - Continuous Foundation Envelope
The
command generates a report of the required and provided capacities on the continuous footing for moments and shears along the footing. The report includes required reinforcement at all report locations along the footing in both the longitudinal and transverse directions. Punching shear is also reported for each supported member.