RAM Concept Help

Copying loads

You can copy point, line, and area loads from one Loading plan to another using the following procedure.

This is convenient since in practice most loads have values for more than one loading.
  1. Select the load and choose Edit > Copy.
  2. Open the loading plan to which you wish to paste.
  3. Choose Edit > Paste. This pastes the new load in the same plan location as the original load. The pasted load is the active selection.
  4. Edit the properties of the new load.
Note: You can copy, paste, and edit multiple loads simultaneously.