Revision
|
Enter a revision number that will be created for this
BOM. Revisions are useful when making changes to an existing BOM document for
an asset.
|
Starting Sheet No
|
This becomes enabled when creating a revision and
allows you to specify the starting page number of the Bill of Material document
that you want to add new entries to. This is useful if you have existing BOM
documents and you want to add new items to the end of the existing document.
You can define a BOM report template to use this starting number as the first
page number of the report you generate. You could then merge the resulting
report with your existing report to ensure that the page numbering flows
properly.
|
Balloon no range
|
Enter a 'Start' and 'End' value to define a range of
balloon numbers that you want to allow for the revision. This is useful to
ensure that when you are adding new entries to an existing BOM document that
you do not accidentally reuse a previously taken balloon number. The
BOM Manager will alert you if you attempt to enter a
balloon number for a new part that is outside the specified range for this
revision.
|
Address
|
The address lines are option but let you enter the
site address where the materials will be shipped to.
|
Save
|
Click this button to create the new BOM revision.
|