ProStructures Help

Synch (Visible Edges)

Used to synchronize all cached dynamic view references in all models in the file.

Accessed from:
  • Ribbon: Concrete > Drawing Production > DV tools > Sync
Key-in: REFERENCE VISIBLEEDGES [ALLMODELS | ALLATTACHMENTS] SYNCHRONIZECACHE