PlantWise Help

Material Cost

The AutoRouter routing order controller gives priority to expensive and exotic pipelines. This table Classifies MATERIAL as EXPENSIVE (T) or not (NIL).

This is a dimensionless table.

Table 1. DPAR-PIPE-MATERIAL-EXPENSE (needed)

MATERIAL

Expensive

316L SS

T

304L SS

T

1 1/4 Cr 1/2 Moly

T

Galvanized Steel

T

304 SS/Alloy 20

T

Poly Lined Steel

T

Steel

NIL

Steel/304 SS

T

Alloy 20

T

304SS

T