To Move a Tunnel Corridor to a New Station
To move the
currently active tunnel corridor to a new station on the same alignment, use
the following procedure:
The procedure will move the first reference line location to the new station, maintaining all other relationships between subsequent reference lines and associated tunnel elements
- On the Home ribbon tab, select the Move Tunnel Corridor tool in the Tunnel Corridor Setup group
- In the tool settings dialog, type the new Station for the first reference line.
- Data point in the view window to accept. The tunnel corridor moved along the current alignment with the first reference line at the specified station.