To Generate TBM UTR As Built Reports
TBM UTR As Built Reports lists all the inputs that have been given to place TBM UTR As Built tunnels and also creates a table with the actual placed rings with their corresponding position and deviations from the theoretical alignment for the active tunnel corridors or tunnel units or all of the current project.
- Either:On the Analysis and Reporting ribbon tab, select the TBM UTR As Built Reports tool in the Tunnel Reporting group.

OR
Key in ANALYSIS TUNNELREPORTING TAPERASBUILTREPORT.
The Preview window opens.
- In the Parameters panel, select the parts of the model to include in the
report:
- Choose All or just the Active tunnel corridor from the Selected Tunnel Corridor drop-down list.
- Choose All or just the Active tunnel from the Selected Tunnel drop-down list.
- Click Submit. The report has been generated.
- (Optional) To save the file:
- In the Preview window, select the Save tool. The Save As dialog opens.
- Type a File name and select a location.
- Click Save.
The file is saved using the .prnx file extension. This file can be re-opened using the Preview window.
- (Optional) Create output of the report:
| Option | Description |
|---|---|
|
To print a copy |
Select either the Print tool (to change printer settings) or Quick Print tool (to use the default Windows printer and settings). |
|
To save a PDF copy |
Select the Export > Export To > PDF File tool. Provide the PDF options and click OK. You will be prompted to save the file. |
|
To e-mail a PDF copy |
Select the Export > E-Mail As > PDF File tool. After saving the file as you would for export, a new e-mail draft is opened in your default e-mail client with this file attached. |