To Generate Construction Scheduler Report

Construction Scheduler Report lists all the inputs that are given in Construction Scheduler GUI for the active tunnel corridors or tunnel units or all of the current project.

To generate a report, use the following workflow

  1. Either:
    On the Analysis and Reporting ribbon tab, select the Construction Scheduler Report tool in the Tunnel Reporting group.

    or

    Key in ANALYSIS TUNNELREPORTING CONSTRUCTIONSCHEDULERREPORT

    The Preview window opens.

  2. In the Parameters panel, select the parts of the model to include in the report:
    1. Choose All or just the Active tunnel corridor from the Selected Tunnel Corridor drop-down list.
    2. Choose All or just the Active tunnel from the Selected Tunnel drop-down list.
  3. Click Submit. The report has been generated.
  4. (Optional) To save the file:
    1. In the Preview window, select the Save tool. The Save As dialog opens.
    2. Type a File name and select a location.
    3. Click Save.

    The file is saved using the .prnx file extension. This file can be re-opened using the Preview window.

  5. (Optional) Create output of the report:
    Option Description
    To print a copy Select either the Print tool (to change printer settings) or Quick Print tool (to use the default Windows printer and settings).
    To save a PDF copy Select the Export > Export To > PDF File tool. Provide the PDF options and click OK. You will be prompted to save the file.
    To e-mail a PDF copy Select the Export > E-Mail As > PDF File tool. After saving the file as you would for export, a new e-mail draft is opened in your default e-mail client with this file attached.