To Merge into Master file in a Sheet View
- Launch OpenPlant Modeler and create a master drawing (Example: Merge 1.dgn).
-
Open the References dialog and attach an
OpenPlant Modeler file to be merged.
- Use the Clipping tools to create a dynamic view of the model.
-
Create a drawing sheet from the dynamic view.
-
Open the References dialog and right-click on the referenced
(Merge 1.dgn) model.
- Right-click on the referenced file and select Merge into Master from the menu.
-
Select the view into which to merge the referenced file.
An alert box asks you to confirm that the selected references are to be merged into the active model.