Using the Fill Area
This site has excess cut from the building pad basement excavation and the optimizer is raising the Driveways and Parking Lot to waste the cut.
Using a Fill Area allows for excess cut to be wasted to a designated location and the impact on the Driveways and Parking Lot is less.