Synchronize Railway
You can access this dialog from the following:
Ribbon: OpenRail Modeling > Rail Topology > Topology Tools > Synchronize Railway
This tool updates the topological model.
A synchronization is needed when:
- An asset is added or changed
- A change in the topological model (such as adding a turnout) is committed.