You must sign in to
ProjectWise to be able to synchronize. You must select the ProjectWise Drive
configuration on the WorkPage to view the iTwin Project in the WorkSet menu.
Select the iTwin project in the WorkSet drop-down menu on the
WorkPage.
Select Browse to navigate to and open the desired DGN from the
project.
Make necessary changes in the DGN.
Select
Sync Changes in the Ribbon
(Drawing > Collaborate > Collaboration
group).
Your design changes will be synchronized and saved in the local
WIP iModel.