JavaScript must be enabled in order to use this site.Please enable JavaScript in your browser and refresh the page. Reports This section describes commands to create reports, rack elevation drawings and logical connectivity schematics. BOM Connection Patch and Patch 2 Build Schematic Rack Power Report Wire Run Parent topic: Bentley OpenComms Inside Plant (ISP)