Connect Back to First Floorplan
After the loop has been wired in the upper floor level, the next step is to wire back down to the first floorplan.
-
Select
(Cable Manager). Opens the Cable Manager dialog. Select the Model Link symbol in the list and then click > Connect below the Model Link <FROM> section.
Opens the Select Level dialog.
- Select Level 1 and click OK. The Model Link ‹TO› section now has the entry: Level1,R1,CSS1. The connection to the lower floorplan has now been established. Close and save the current drawing, then open the first (lower) floorplan in Electrical discipline.