To route in a vertical plane
- Study the path of the route and identify duct route needed to be branched out vertically in your building structure.
- Be in the desired plane and activate placing duct fitting.
- Choose proper justification that aligns the duct along the wall or obstruction. Use the Placement settings accessed from ribbon tab.
- Route the duct in the horizontal plane along the walls.
- Continue the route along the wall till desired point you need to route the duct vertical.
- Using the E key in AccuDraw apply the Cycle Rotation. The compass rotates along its axes.
- Reset before changing the route vertical and switch the justification to suit the vertical support.
- Continue routing the duct till higher floor.
- Enter the smart lock (press <Enter> in AccuDraw) to accept the height of the duct in vertical direction.