OpenBridge Modeler

What's New in CONNECT Edition Update 8.2

This topic summarizes the new enhancements in OpenBridge Modeler CONNECT Edition Update 8.2.

  • Allow users to modify OBM Objects
  • GINT Civil Tools
  • Optional Install of Generative Components
  • iTwin Services (Technology Preview)
  • Workspace and Configuration changes
  • Beam Layout - Display Overhang minimum and maximums
  • Beam Report - New Column showing Bearing to Bearing Distances
  • Segmental Templates - Tendon Point Naming improvements
  • Place Functional Components as Accessories
  • Functional Component - New option to Tag Corbel, and report quantities
  • Barrier - Option to adjust placement after placement
  • Improved Deck Elevation Reports
  • Deck Outlines for all Bridge Types
  • Transfer Concrete diaphragms as loads to LBC
  • Cross Frame Placement Dialog - Copy/Paste from Excel
  • Material Library Dialog - Copy/Paste from Excel
  • Built on MicroStation PowerPlatform Update 14
  • Built on Civil Platform (OpenRoads Designer) 2020 Release 2
  • Updated to ProStructures Update 5
  • Optional install of Lumen RT Update 14
Note: Due to OBM file format changes in this release, files created in previous releases of OBM CE can be opened in this release, but once opened with the current release, cannot be opened in the previous versions.