OpenBridge Modeler

To place closure pours

To place closure pours between each of the cantilevers on a segmental bridge, use the following procedure.

You must have at least two balanced cantilever builds placed on your bridge unit.
The cast-in-place closures are used to tie two free cantilever ends together in the balanced cantilever construction method.
  1. Either:

    On the Home ribbon tab, select the Close tool in the Superstructure group

    or

    key in bmgeom segmental closebalance

  2. In the Close Segmental Balanced tool settings dialog, type a value in the Max CIP Segment Length field.
  3. In the view window, data point on the bridge alignment.
The closure pours are added to the balanced cantilever segmental construction.