MicroStation CONNECT Edition Help

Associating a Saved View with a Callout

When you place a callout with the Create Drawing check box on, the saved view is associated with the callout. Doing this ensures that:

  • The callout's fields are updated when the saved view is attached to a sheet.
  • The saved view is updated when you modify the callout.

However, if you place a callout with the Create Drawing check box off, the saved view is not associated with it. To associate the saved view with the callout, create a saved view and manually associate it with the callout. When you do this, the callout's fields are updated when the saved view is attached to a sheet, but the saved view is not updated when you modify the callout.