Bentley StormCAD CONNECT Edition Help

Time Steps and Runoff Methods

The calculation and hydrograph time steps used vary according to the runoff method selected, as follows:

  • SWMM Runoff Method
  • SCS Runoff Method
  • RTK Runoff Method
  • Unit Hydrograph Runoff Method
  • GVF/Convex Routing