To Place a Concrete Spread Footing Beneath the Concrete Pile using Place Concrete tool
-
Select
(
Place Concrete Pier
).
The Place Concrete Pier tool settings window appears with a rectangular section selected for placement.
Also by default, the Foundations family of parts is set in the Family/Part Toolbar.
- You will need to change the active Part, add a rectangular section and change the placement options.
-
The pier is attached to the pointer at the top center placement
position. Move the pointer near the bottom of the concrete pile.
The Structural snap icon appears while the
pile is highlighted, immediately confirming that the exact location is
selected. The status line now prompts you to:.
Enter data point to place member
Enter a data point.