Single and Double Pile Two-Way Shear
Please refer to sections 4.16.8 and 4.16.9 for a discussion on the two-way shear check performed on single and double piles. The pile two-way shear critical section is taken at 1.5d + 6dp /10
The capacity check that is performed is:
where= |